Solar energy

/

Dominican Republic

PROJECT PROFILE · CERTIFICATE-BASED CLIMATE PROTECTION

Cumayasa 1 & 2

Cumayasa 1 & 2

Cumayasa 1 & 2

Two solar parks feed in together. The climate impact is calculated from what their electricity replaces in the national grid.

Two solar parks feed in together. The climate impact is calculated from what their electricity replaces in the national grid.

Two solar parks feed in together. The climate impact is calculated from what their electricity replaces in the national grid.

The plants at Cumayasa have a combined nominal capacity of 80 MW and are connected to the Dominican Republic's electricity grid via a 138 kV connection. This page separates the technical project activity, the methodologically calculated emission reduction, and the subsequent allocation of certificates.

Photovoltaic modules in a warm, tropical landscape

SOLAR PARK · SYMBOLIC IMAGE

Note: The image shows a photovoltaic system as a symbolic representation. It does not originate from Cumayasa or the Dominican Republic and does not prove the impact of the described project. Photo: Quang Nguyen Vinh / Pexels.

COUNTRY

Dominican Republic

GOLD STANDARD ID

GS12212

TECHNOLOGY

80 MW AC Solar PV

STATUS IN REGISTER

Gold Standard Certified Project

WHY THE COMPARISON MATTERS

Electricity is measured. The difference to the grid without the project is calculated.

A photovoltaic system does not measure avoided tonnes of CO₂. It measures generated and fed-in electricity.

For the carbon footprint, this net feed-in is linked to an emission factor of the connected electricity system determined in accordance with ACM0002. Only the documented comparison with the baseline scenario yields an emission reduction for a clearly defined monitoring period.

The facility is visible. Its eligible climate impact only arises from measurement, methodology, and independent verification.

The facility is visible. Its eligible climate impact only arises from measurement, methodology, and independent verification.

01 · PROJECT AT A GLANCE

The data pass for Cumayasa

The registry lists Cumayasa 1 and Cumayasa 2 together as a single large-scale Gold Standard project. Capacities, estimates and already issued units are reported separately.

PROJECT NAME IN THE REGISTER

PROJECT NAME IN THE REGISTER

Cumayasa 1 and 2 Photovoltaic Solar Plant

LOCATION

km 10 of Cumayasa · Municipality of Villa Hermosa · La Romana Province · Dominican Republic

GOLD STANDARD ID

GS12212 · Register detail 4141

PROJECT DEVELOPERS IN THE REGISTER

EFD Ecoener Fotovoltaica Dominicana, S.R.L.

PROJECT SCALE

Large Scale

CUMAYASA 1 AND 2

Cumayasa 1: 50 MW AC · 60.04 MWp. Cumayasa 2: 30 MW AC · 36.007 MWp.

SHARED GRID CONNECTION

138 kV connection via the Cumayasa substation to the national grid (SENI)

PROJECT STANDARD AND METHODOLOGY

Gold Standard for the Global Goals · ACM0002 “Grid-connected electricity generation from renewable sources”, Version 21.0.0

CREDITING PERIOD

06/09/2023–05/09/2028 · renewable · 5 years

ANNUAL ESTIMATE, MONITORING AND FORECASTING

138,385 t CO₂e annual expectation · first monitoring period 06/09/2023–31/03/2024 · 69,330 VERs issued, of which 36,064 Vintage 2023 and 33,266 Vintage 2024 · 3,505 VERs retired · expected technical lifetime 25 years

TEST BENCH OF THIS PAGE

TEST BENCH OF THIS PAGE

4 September 2026

Why the estimate and issuance are not the same: 138,385 t CO₂e is the expected annual value stated in the registry. The 69,330 VERs issued are based on the shorter, independently verified first monitoring period. For a concrete allocation, it is the serial numbers actually issued that count – not the annual estimate.

02 · WHAT THE PROJECT PROVIDES FOR

Two plants, one grid connection, one shared project balance sheet

Cumayasa 1 and 2 are described separately from a technical perspective, but are accounted for together in the Gold Standard registry. The decisive factor is the amount of energy quantifiably fed into the electricity grid.

01

Generate solar power

Both photovoltaic systems convert solar energy into electricity. The installed capacity describes the system capacity – not automatically the generation of an individual period.

02

Feed-in together

The electricity enters the national interconnected system of the Dominican Republic via the 138 kV connection and the Cumayasa substation.

03

Check operating data

Meter and SCADA data document the feed-in. Monitoring reports assign them to a period; an independent auditing body evaluates the data and calculation.

03 · HOW A UNIT IS CREATED

Grid feed-in is converted into a calculated emission reduction.

ACM0002 defines how grid-connected renewable electricity generation is accounted for against a baseline of the connected electricity system.

01

Set baseline

The reference scenario describes how the electricity in the national grid would have been provided without the two solar parks.

02

Measure net feed-in

The actual amount of electricity delivered to the grid during the monitoring period is recorded via measuring and SCADA systems.

03

Apply emission factor

The net feed-in is linked to the methodologically determined emission factor of the connected electricity system. Relevant project and leakage emissions are taken into account.

04

Verify and issue

Following independent audit, VERs with vintage and serial numbers can be issued in the registry. A subsequent retirement documents their specific use.

04 · DOCUMENTED ADDITIONAL CONTRIBUTIONS

The register entry mentions four SDG references

In the Gold Standard registry, SDGs 7, 8, 10 and 13 are designated as certified impact claims. The specific significance depends on the respective documented indicators and monitoring periods.

SDG 7 · ENERGY

Renewable generation capacity

The two plants provide additional photovoltaic capacity and feed electricity into the national grid.

SDG 13 · CLIMATE ACTION

Calculated emission reduction

The climate contribution is derived from the verified difference to the electricity system baseline. It applies to the respective monitoring and crediting framework.

SDG 8 · WORK

Project-based employment

Construction, operation and maintenance can stimulate employment and economic activity. The decisive factors are the specific indicators set out in the project documentation – not a flat-rate impact on jobs.

SDG 10 · REDUCED INEQUALITIES

Reported, verifiable reference

The register entry shows SDG 10. The associated target group, indicator and period must be classified based on the certification documents.

ON SDG COMMUNICATION

An identified SDG reference is not a general sustainability seal. It merely shows which additional areas of impact the project documents within the standard framework; it does not make the project or the supporting companies sustainable as a whole.

05 · FOR SUPPORTING COMPANIES

Issued VERs are not yet an allocation to a company.

The register shows 69,330 issued and 3,505 retired units. Concrete support only becomes traceable through the unique retirement for a beneficiary.

The register shows 69,330 issued and 3,505 retired units. Concrete support only becomes traceable through the unique retirement for a beneficiary.

A reliable allocation includes at least:

01

Project name and Gold Standard ID GS12212

02

specific quantity in t CO₂e

03

Vintage or monitoring period

04

Decommissioning date and register reference

05

full serial number range

06

Beneficiary and documented purpose of use

The profile explains the project. A company's actual climate contribution is only proven by the retirement and allocation certificate.

The profile explains the project. A company's actual climate contribution is only proven by the retirement and allocation certificate.

06 · CLASSIFICATION AND COMMUNICATION

What the support means – and what it doesn't

A voluntary climate contribution is presented separately from reductions within one's own value chain.

IT DOCUMENTS

IT DOES NOT AUTOMATICALLY MEAN

two photovoltaic plants with a combined 80 MW AC and shared grid feed-in

a continuous output of 80 MW or the direct supply of specific households

an emission reduction calculated and verified in accordance with ACM0002

a direct measurement of avoided CO₂ emissions at the solar panels

a Gold Standard-certified project with issued VERs

automatically an Article 6 authorisation, a CCP label or an external rating

Electricity generation without fuel combustion in plant operation

a complete life cycle assessment including raw materials, land use and end of life

the links to SDGs 7, 8, 10 and 13 shown in the registry

a comprehensive sustainability status for project, electricity or supporter

the retirement of specific CERs for a beneficiary

a reduction of own emissions, climate neutrality, or a green product label

It is not the solar photo that proves the effect, but the audited period, the units outputted and their clear allocation.

It is not the solar photo that proves the effect, but the audited period, the units outputted and their clear allocation.

07 · SOURCES AND RELEVANCE

The basis openly accessible

Status, expenditures and decommissionings are subject to change. The current register entry and the published project documents remain authoritative.

TEST BENCH

4 September 2026

We are happy to answer any specific questions regarding project allocation, vintage, or available documentation.