Solar panels generate electricity. How many emissions are avoided as a result is not decided by appearances – but by measurement, grid factor and testing.

Solar panels generate electricity. How many emissions are avoided as a result is not decided by appearances – but by measurement, grid factor and testing.

GS7760 describes a grid-connected solar farm with an installed capacity of 600 MW near Jamsar in the Bikaner district. This page separates technical capacity, measured power generation, calculated emission reductions, the current registry status and the subsequent allocation of units.

Large-scale photovoltaic system in a dry landscape

SOLAR ENERGY · SYMBOLIC IMAGE

Note: The photo shows a photovoltaic system in a dry landscape. It does not originate from the GS7760 project area in Rajasthan and does not demonstrate project impact. Photo: joao Guerreiro · Pexels.

COUNTRY

India

GOLD STANDARD ID

GS7760

TECHNOLOGY

Solar photovoltaics

STATUS IN REGISTER

Gold Standard Certified Project

WHY FEED-IN MATTERS

The solar power is measurable. The avoided emission is calculated.

The solar power is measurable. The avoided emission is calculated.

The electricity meter records electricity. It does not measure avoided tonnes of CO₂.

The electricity meter records electricity. It does not measure avoided tonnes of CO₂.

For the project balance, the documented grid feed-in is linked with a methodologically determined emission factor of the Indian interconnected grid. Only this comparison yields the calculated emission reduction for a clearly defined monitoring period.

The plant generates electricity. The method answers which emissions are contrasted with this electricity in the reference scenario.

01 · PROJECT AT A GLANCE

The data pass for GS7760

The public registry entry states the project size, developer, status, and crediting periods. The project version provided supplements technical and verification-related information for a completed monitoring period.

PROJECT NAME IN THE REGISTER

Clean Electricity Generation by Solar Power Project in Rajasthan

LOCATION

Jamsar Village · Bikaner District · Rajasthan, India

GOLD STANDARD ID

GS7760 · Register page 2605

PROJECT DEVELOPERS IN THE REGISTER

Azure Power India Private Limited

PROJECT APPROACH

Grid-connected ground-mounted photovoltaic system · Feed-in into the Indian national grid

INSTALLED CAPACITY

600 MW AC

PROJECT STANDARD

Gold Standard for the Global Goals

PROJECT STATUS

Gold Standard Certified Project

PROJECT SIZE

Large Scale · independent project

FIRST CREDITING PERIOD

15/12/2020–14/12/2025 · ACM0002 Version 20.0

CURRENT CREDITING PERIOD

15/12/2025–14/12/2030 · ACM0002 Version 22.0

ESTIMATED ANNUAL UNITS

1,011,772 · dynamic register specification

DOCUMENTED MONITORING PERIOD

01/10/2022–31/03/2024

ELECTRICITY GENERATION IN THIS PERIOD

2,159,757 MWh

CALCULATED EMISSION REDUCTION

2,018,509 t CO₂e for this monitoring period

RECOMMENDED QUANTITY FOR DISPLAY

1,876,194 t CO₂e according to the project version provided

ARTICLE 6 AUTHORISATION

Not identified in the provided register and project material

EXTERNAL CARBON CREDIT RATING

No project-related rating indicated in the documents provided

CCP status

No project-specific CCP marking identified in the provided documentation

TEST BENCH OF THIS PAGE

05/09/2026

What the current registry status changes: the old page only mentions the first crediting period up to December 2025 and ACM0002 Version 20. The registry now lists a second period up to 14/12/2030 with ACM0002 Version 22.0.

Why 2,159,757 MWh is not an annual figure: This amount of electricity relates to the 18-month monitoring period from 01/10/2022 to 31/03/2024. It is therefore represented neither as annual generation nor as current output.

Why multiple CO₂ values appear: The register entry states 1,011,772 estimated units per year. The provided version states 2,018,509 t CO₂e as the calculated result for a specific monitoring period and 1,876,194 t CO₂e as the quantity recommended for issuance. Expected value, monitoring result, and issuance quantity are not interchangeable.

Technology category in the registry: The current entry uses the category "Solar Thermal – Electricity". In contrast, the project documents explicitly describe a grid-connected solar photovoltaic system. This page follows the project documents for the technical description and makes the registry classification transparent here.

02 · WHAT THE PROJECT PROVIDES FOR

Harness solar energy, feed electricity into the grid and track the generated amount transparently

For the carbon footprint, it is not just the installed capacity that counts. What matters is the electricity generated within a defined period and fed into the interconnected grid at the defined metering points.

01

Generating solar power near Jamsar

The project documentation describes a free-standing photovoltaic system with 600 MW AC. Commissioning took place in stages between December 2020 and December 2021.

02

Feed into the grid

The electricity generated is fed into the Indian Unified Grid. It does not follow from this that specific households, products or companies are directly supplied with this electricity.

03

Check creation and calculation

Measurement data, grid factor, calculation documents and independent verification form the basis for the recommendation and subsequent issuance of units.

03 · HOW A UNIT IS CREATED

Grid feed-in is converted into a calculated emission reduction

Grid feed-in is converted into a calculated emission reduction

ACM0002 provides the methodological framework for grid-connected electricity generation from renewable sources. The version to be applied depends on the crediting and monitoring period.

01

Set reference scenario

The baseline describes how the corresponding amount of electricity would have been provided in the Indian grid without the project.

02

Measure grid feed-in

The electricity actually generated and fed in at the defined metering points is documented for the monitoring period.

03

Apply emission factor

The eligible electricity quantity is linked to the methodologically determined emission factor of the electricity grid. Relevant project and leakage emissions are taken into account.

04

Verify and issue

Following an independent audit, a specific quantity can be issued in the register for a defined period. Only the subsequent decommissioning documents its specific use.

04 · OTHER PROJECT REFERENCES

What can be described in addition to the unit calculation

What can be described in addition to the unit calculation

The Gold Standard registration maps the project to Goals 7, 8 and 13. This does not yet imply a comprehensive sustainability label. Further impacts require their own indicators, sources and timeframes.

ENERGY SYSTEM

600 MW solar capacity in the interconnected grid

The solar park expands the grid-connected generation capacity from solar energy. The type of generation that would otherwise occur in the reference case is analysed methodologically via the baseline – it is not simply assumed to be "coal-fired power" as a rule.

MONITORING

Amount of electricity at the defined measuring point

The provided version specifies 2,159,757 MWh for 18 months. This figure is assigned to a specific period and is not to be interpreted as a permanent or annual project output.

INFRASTRUCTURE

Large-scale energy plant

The project represents long-term energy infrastructure. Statements regarding security of supply, grid relief, or regional development nevertheless require their own data and are not derived from the quantity of units.

ENVIRONMENT

No fuel combustion during plant operation

Photovoltaics do not require any fossil fuel during operation. A complete environmental assessment would nevertheless have to include manufacturing, land use, cleaning, grid infrastructure and end-of-life.

FOR COMMUNICATION

A link to renewable energy or the Sustainable Development Goals is not a seal of approval for the project as a whole. What matters is which specific statement is supported by which indicator, which source, and which time period.

05 · FOR SUPPORTING COMPANIES

A registry project does not yet constitute an assignment to a company

The registry entry explains the project and its crediting periods. Specific support only becomes traceable through the unique retirement of certain units for a beneficiary. A reliable allocation includes at least:

Project name and Gold Standard ID GS7760

specific quantity in t CO₂e

Vintage or monitoring period

Issue and Decommissioning Date

Serial numbers or unique register reference

Beneficiary and documented purpose of use

The profile explains the project. A company's actual climate contribution is only proven by the retirement and allocation certificate.

06 · CLASSIFICATION AND COMMUNICATION

What the support means – and what it doesn't

A voluntary climate contribution is presented separately from reductions within one's own value chain.

CAN BE DOCUMENTED

IS NOT AUTOMATICALLY ASSIGNED

a certified Gold Standard project with the ID GS7760

a reduction of your own corporate or product emissions

600 MW of installed solar capacity

a certain annual volume of electricity or permanent availability

measured feed-in for a defined monitoring period

that exclusively coal-fired power was displaced or that certain consumers were supplied

an emission reduction calculated and verified in accordance with ACM0002

a direct measurement of avoided emissions at the solar panel

the decommissioning of specifically identified units

Climate neutrality, CO₂ neutrality or a positive environmental claim

references to SDG 7, 8 and 13 mentioned in the register

that each additional social or environmental impact has been individually proven

A climate contribution should not sound bigger than can be documented.

07 · SOURCES AND RELEVANCE

Read registers, project documents and specific assignments separately

Status, methodology, crediting periods and available units are subject to change. The current registry entry, the project documents linked there and, in the case of concrete support, the associated retirement certificate remain authoritative.

TEST BENCH

5 September 2026

Would you like to know which units, vintages, and cancellation certificates are available for a specific allocation?