PROJECT FACTSHEET · CERTIFICATE-BASED SUPPORT
The programme establishes a common framework for smaller-scale solar and wind energy projects in Sri Lanka. Participating facilities feed electricity from renewable sources into the national grid. Project contributions are made via certificates that correspond to the specifically documented project activities.

SOLAR & WIND · REPRESENTATIONAL IMAGE
Illustrative image: Solar and wind energy in Sri Lanka. Source: Unsplash · Licence: Unsplash License.
COUNTRY
Sri Lanka
GOLD STANDARD ID
GS11416
PROGRAMME TYPE
Solar and wind energy · PoA
SUPPORT
Certificate-based
WHY RENEWABLE ELECTRICITY GENERATION MATTERS
The extent of the eligible emissions reduction is calculated based on the respective grid feed-in and a methodically defined baseline scenario. For the project contribution, the allocation of the specifically used and decommissioned units is what counts.
A traceable project contribution combines documented feed-in with an established methodology and clear allocation.
CONTENT
01
Project Profile
02
Programme and facilities
03
Calculation
04
Contributions to the project
05
Assignment
06
Classification
07
Sources
01 · PROGRAMME AT A GLANCE
The data passport for GS11416
The profile outlines the programme structure, technologies, and certification framework. Information on units is based on documented registry entries and specific project activities.
PROGRAMME NAME
Programme of Activities for Small-Scale Solar and Wind Power Generation in Sri Lanka
COUNTRY
Sri Lanka
PROGRAMME GOLD STANDARD ID
GS11416
Commercial Register Entry
Record 3437
PROGRAMME STRUCTURE
Programme of Activities (PoA) with individual project activities (VPAs)
COORDINATION
Koho Trading and Consultancy (Private) Limited according to the register
STANDARD
Gold Standard for the Global Goals
TECHNOLOGICAL FRAMEWORK
Smaller grid-connected solar and wind energy projects
DOCUMENTED EXAMPLES
Four solar projects: GS11417, GS11418, GS11419 and GS11420; 10 MW each in the 2023 Gold Standard document
METHODOLOGY
AMS-I.D. – Grid connected renewable electricity generation; check version and validity period based on the respective Gold Standard project documentation
PROGRAMME STATUS
Gold Standard Certified Design
CREDITING PERIODS
Add to the register for the relevant program and the specific VPA used.
ESTIMATED ANNUAL UNITS
67,083 according to register estimate; no quantity previously issued
PROGRAMME ENTRY EXPENSES
No issues reported in the issuance list of the programme entry
PROGRAMME ENTRY DECOMMISSIONINGS
No specific number is displayed in the screenshot provided
UNITS OF THE INDIVIDUAL PROJECTS
Check separately in the respective VPA entry
METER READING
28/10/2026 · provided screenshot of the programme listing
PROOF OF IDENTITY
GS11416 refers to the parent programme. Assign specific units of a VPA separately.
Regarding the identity: GS11416 refers to the overarching programme. Individual plants may have their own Gold Standard IDs and separate registry entries. The number 3437 is the record identifier in the programme's URL.
02 · PROGRAMME AND SYSTEMS
A common framework for multiple project activities
A Programme of Activities, or PoA for short, is an overarching framework. For GS11416, it covers solar and wind energy. The available Gold Standard documents specify four specific solar installations.
01
Solar One Ceylon
GS11417 · Pudukadumalai · 10 MW
02
Nedunkulam Solar PV
GS11418 · 10 MW
03
Anorchi Lanka
GS11419 · Baruthankanda · 10 MW
04
Iris
GS11420 · Baruthankanda · 10 MW
03 · HOW AN EMISSIONS REDUCTION IS CALCULATED
The amount of electricity produced by each facility is documented. The reduction in emissions is calculated based on a set baseline comparing it to power generation without the project activity. It is a benchmark determined through specific methodology and is not measured directly at a facility.
01
Generate and feed electricity into the grid
The participating facilities generate electricity from renewable sources and feed it into the grid. The feed-in relevant to the monitoring period is recorded.
02
Define comparison scenario
The methodology determines how the baseline electricity generation without the project activity is assessed. This involves, among other things, the use of a suitable emission factor.
03
Calculate emission reduction
The documented electricity volume and relevant methodological factors form the basis of the calculation. Mandatory corrections and project emissions are taken into account where applicable.
04
Check and issue units
A monitoring report is independently audited. Following successful verification and approval, units can be issued in the respective registry for the period concerned.
04 · CONTRIBUTIONS TO THE PROJECT
Renewable electricity generation and plant operation
The plants supply renewable electricity to the power grid. Construction, operation and maintenance require technical services. The specific contributions documented for an individual activity can be found in its project data.
ENERGY
Electricity from renewable sources
The documented solar projects generate electricity using photovoltaics. The programme framework also encompasses wind energy projects.
WORK
Operations and Maintenance
Solar systems and wind turbines require technical monitoring, maintenance, and other services. Specific jobs must be verified using the relevant documentation.
EMISSIONS
Calculate emission reduction in comparison
For each project activity, it is determined which emissions would occur in methodological comparison to electricity generation without the project.
POTENTIAL SDG RELEVANCE
SDGs 7, 8 and 13 in the programme entry
The programme entry shows estimated links to SDG 7 ‘Affordable and Clean Energy’, SDG 8 ‘Decent Work and Economic Growth’, and SDG 13 ‘Climate Action’.
VERIFICATION NOTE
Specific certified indicators and their results should be reviewed in the associated documentation for the respective project activity. Source: provided screenshot of programme entry GS11416, dated 28 October 2026.
05 · FOR SUPPORTING COMPANIES
A project contribution requires a unique assignment
A company can support the programme environment by purchasing and cancelling related certificates. The key factors for verification are the units actually acquired and the corresponding project activity. To ensure a verifiable project contribution, at least the following details are documented:
Name and Gold Standard ID of the GS11416 programme, as well as the specific project activity, if the units are assigned to a VPA
Quantity of retired units in t CO₂e
Vintage or corresponding monitoring period
Decommissioning date and register reference
Serial numbers or other unique unit references
Beneficiary and documented purpose of use
A parent programme entry and the entries for individual installations may show differing status and quantity data. The specific units and their decommissioning proof are decisive for the allocation.
06 · CLASSIFICATION AND COMMUNICATION
What a project contribution means
The project contribution is presented separately from the supporting company's carbon footprint and reduction measures.
THE PROJECT CONTRIBUTION DOCUMENTS
IT DOES NOT FOLLOW
the decommissioning of specific certificates for a documented purpose
a reduction in your own company's or product emissions
support in connection with an assigned project activity
a direct electricity supply from this facility to the supporting company
a methodically calculated and verified emissions reduction
direct measurement of avoided CO₂ amounts at the individual plant
the allocation of units for a specific period
the same emissions reduction in future years
a programme framework for solar and wind energy
that a specific certificate supports both technologies at the same time
a documented write-off or decommissioning
the admissibility of each advertising claim
This support does not replace measures to prevent and reduce your own emissions. It does not imply that a product or company is climate-neutral. Communication framework: name the programme and specific plant, explain the type of support, and make the proof accessible.
07 · SOURCES AND RELEVANCE
Making the foundation openly accessible
Project status, certificate holdings and retirements are subject to change. For a specific project contribution, the details of the respective certificate and its registry entry are authoritative.
GOLD STANDARD
GS11416 in the Gold Standard Registry
Programme entry and access to related information.
GOLD STANDARD
Document DEV_542
Naming of the programme framework and the four solar projects mentioned, GS11417 to GS11420.
UNFCCC
Programme of Activities
UNFCCC entry for the CDM programme and methodological framework of the same name. Do not equate CDM data with Gold Standard issuances.
UNFCCC
AMS-I.D. methodology
Methodology for grid-connected electricity generation from renewable sources.
CERTIFICATION AND COMMUNICATION
Gold Standard Claims Guidelines
Guidance for transparent claims regarding certification status and project contributions.
METER READING
28 October 2026
We are happy to answer any questions about the project and the documentation of a project contribution.