PROJECT PROFILE · CERTIFICATE-BASED CLIMATE PROTECTION

BAESA · Brazil

A hydroelectric power plant does not measure avoided emissions. It generates electricity – the CO₂e quantity is only created through grid data, methodology, and auditing.

A hydroelectric power plant does not measure avoided emissions. It generates electricity – the CO₂e quantity is only created through grid data, methodology, and auditing.

VCS 10 refers to the BAESA Project at the Barra Grande hydroelectric power plant in southern Brazil. This page separates the plant, power generation, calculated emission reduction, issuance, and the subsequent allocation of specific VCUs.

Symbolic image of a hydropower landscape in Brazil

BRAZIL · REPRESENTATIVE IMAGE

Note: The image is for the contextualisation of hydropower in Brazil. It does not show the Barra Grande plant, nor does it prove the existence of the plant or any project impact. Photo: Unsplash.

COUNTRY

Brazil

Verra ID

VCS 10

TECHNOLOGY

Grid-connected hydropower

APPENDIX

Barra Grande HPP

WHY THE TIMEFRAME MATTERS

The facility exists permanently. The result always belongs to a monitoring period.

An installed capacity describes the technical capability to generate electricity. It does not indicate how much electricity was fed into the grid in a given year, nor what amount of CO₂e was verified and issued for that period.

For VCS 10, in accordance with ACM0002, the documented grid feed-in is linked to a methodologically determined baseline scenario of the electricity system. This results in a calculated emission reduction for a defined period of time – not a direct measurement at the power plant.

The capacity describes the plant. The emission reduction results from documented grid feed-in, methodology, and verification.

01 · PROJECT AT A GLANCE

The data pass for VCS 10

Project design, estimated annual volume, issued units and retirements serve different purposes. Therefore, they are not presented alongside one another here as interchangeable key figures.

PROJECT NAME IN THE REGISTER

PROJECT NAME IN THE REGISTER

BAESA Project

COUNTRY AND LOCATION

COUNTRY AND LOCATION

Anita Garibaldi and Pinhal da Serra · Santa Catarina and Rio Grande do Sul, Brazil

VCS PROJECT ID

VCS 10

PROJECT SPONSORS IN THE REGISTER

PROJECT SPONSORS IN THE REGISTER

Energética Barra Grande S.A. (BAESA)

SECTOR AND METHODOLOGY

SECTOR AND METHODOLOGY

Energy industries (renewable/non-renewable sources) · ACM0002

VALIDATOR

VALIDATOR

Earthood Services Limited

SYSTEM AND PERFORMANCE

HPP Barra Grande · 690 MW · three generator units of 230 MW each

ESTIMATED AVERAGE ANNUAL QUANTITY

608,686 t CO₂e · Registry estimate, no guaranteed result

PROJECT START · REGISTRATION · CREDITING

01/11/2005 · 06/04/2020 · 01/01/2006–31/12/2015, Term 1

VCU STATUS IN REGISTER

6,747,207 issued · 697,160 active · 5,759,493 decommissioned · 148,539 cancelled

TEST BENCH OF THIS PAGE

TEST BENCH OF THIS PAGE

29 September 2026

Regarding the period and the figures: the currently visible registry entry states 31.12.2015 as the end of the crediting period. For a specific allocation or use, the vintage, serial number, unit status and proof of retirement must be verified individually.

02 · WHAT THE PROJECT PROVIDES FOR

Generate electricity, feed it into the grid and document the transfer point.

The system is visible. However, for the certificate logic, the measured net electricity quantity and the methodological baseline count – not the installed capacity alone.

01

Converting water into electricity

The plant uses the Rio Pelotas to generate electricity. The technical specification for capacity describes the potential output of the machinery, not the amount of electricity generated in a year.

02

Feed electricity into the grid

The physical electricity is fed into the Brazilian grid. It cannot be attributed to an individual company or a single product.

03

Check measured values and boundaries

Meter data, billing documents and the procedures established in the monitoring plan form the data chain for the respective monitoring period.

03 · HOW A UNIT IS CREATED

Grid feed-in becomes a calculated reduction.

Grid feed-in becomes a calculated reduction.

ACM0002 regulates the methodological comparison between the project electricity and the electricity that would have been generated in the grid without the project. The version and input parameters belong to the respective verification period.

01

Determine reference network

The baseline describes the emission intensity of the electricity generation assumed without the project. It is a methodological reference value and not a measurement at the river or the turbines.

02

Record net electricity

Generation, self-consumption and grid feeding are documented for a defined period in accordance with the monitoring plan.

03

Apply emission factor

The eligible electricity volume is linked to the net emission factor determined by the methodology; relevant project and, if applicable, leakage emissions are taken into account according to the methodology.

04

Verify and issue

Following independent verification, VCUs can be issued with vintages and serial numbers. A retirement only documents their actual use.

04 · SYSTEM CONTEXT AND BOUNDARY

Hydroelectric power, mains electricity, and project units are not the same.

The plant can be described technically. However, this does not imply either a general environmental assessment or a permanent promise of effectiveness for the project or the individual VCUs.

TECHNOLOGY

Three units, no annual forecast

BAESA lists three generator units of 230 MW each. This figure describes the installed capacity, but not a specific annual output, capacity utilization or quantity of VCUs.

POWER PLANT ENVIRONMENT

The attachment is not the certificate of proof

Electricity generation is the physical starting point. What matters for the unit is the documented monitoring period, methodology, and independent verification.

OTHER EFFECTS

No overall rating from the VCU status

A VCU status does not prove a comprehensive ecological or social assessment of the plant, its reservoir or its surroundings. Such statements require their own sources and reporting boundaries.

DELIMITATION

No statement about the supporting company

A specific retirement affects the VCUs identified there. It does not alter the CCF, the PCF, or the CO₂e profile of the supporting company.

CLASSIFICATION

A statement on the plant, unit, and support is not to be equated with a complete environmental or impact assessment.

05 · FOR SUPPORTING COMPANIES

Issued VCUs do not yet constitute an allocation.

Only the proof of cancellation connects specific units with a company and a documented purpose. In the case of a completed crediting period, the vintage, serial number and status of the unit must be individually traceable.

A reliable allocation comprises at least:

01

Project name and VCS-ID 10

02

specific quantity in t CO₂e

03

Vintage and monitoring period

04

Issue and decommissioning date

05

complete serial number range

06

Beneficiary and documented purpose of use

Specific VCUs must be individually verified with vintage, serial number, date of issuance, proof of retirement, beneficiary, and purpose of use.

06 · CLASSIFICATION AND COMMUNICATION

What can be documented – and what does not follow automatically.

A voluntary climate contribution is presented separately from emissions within one's own value chain.

CAN BE DOCUMENTED

is not automatically assigned

a hydroelectric power plant as a project reference and an installed technical capacity

a specific annual generation or utilisation

608,686 t CO₂e as the estimated average annual quantity in the registry

that this quantity is reached, verified or available each year

6,747,207 VCUs issued in the registry snapshot

the availability, quality or assignment of each individual unit

a calculation according to ACM0002

a direct CO₂ measurement at the power plant or that every kilowatt hour has the same CO₂e impact

a retirement of specific VCUs for a beneficiary

the reduction of one's own emissions, climate neutrality or a green product label

Project, standard, vintage, quantity and serial numbers

Climate neutrality of a product or company

A climate contribution should not sound greater than monitoring, unit, and allocation document it to be. Support for the project is reported separately from your own CO₂e footprint and is not offset.

07 · SOURCES AND RELEVANCE

The basis openly accessible

Project status, expenditures, decommissionings and individual units are subject to change. The current registry entry and the project, monitoring and audit documents published there remain decisive.

TEST BENCH

29 September 2026