Wind energy

/

Thailand

PROJECT PROFILE · CERTIFICATE-BASED CLIMATE PROTECTION

West Huaybong 3 · Thailand

A wind turbine generates electricity. How many emissions are avoided as a result is not decided by the rotor movement – but by measurement, reference scenario and verification.

A wind turbine generates electricity. How many emissions are avoided as a result is not decided by the rotor movement – but by measurement, reference scenario and verification.

GS7746 describes a grid-connected onshore wind farm in Nakhon Ratchasima with an installed capacity of 103.5 MW. This page separates technical performance, measured grid feed-in, calculated emission reduction, registry status and the subsequent allocation of VERs.

A single wind turbine against a bright sky in Thailand

THAILAND · REPRESENTATIVE IMAGE

Note: The image is solely for the purpose of classifying the country and technology. It does not show West Huaybong 3 or a project site and is not proof of project impact. Photo: Nao xotl / Pexels.

COUNTRY

Thailand

GOLD STANDARD ID

GS7746

TECHNOLOGY

Onshore wind energy · 103.5 MW

STATUS IN REGISTER

Gold Standard Certified Project

WHY FEED-IN MATTERS

The electricity is measurable. The avoided emission is calculated.

The electricity meter records electricity. It does not measure avoided tonnes of CO₂.

For the project balance, the documented grid feed-in is linked with a methodologically determined emission factor of the Thai electricity system. Only this comparison results in a calculated emission reduction for a clearly defined monitoring period.

The plant generates electricity. The method answers which emissions this electricity is compared to in the reference case.

The plant generates electricity. The method answers which emissions this electricity is compared to in the reference case.

01 · PROJECT AT A GLANCE

The data pass for GS7746

The registry entry specifies the project scope, methodology, crediting period, issued units, and retirements. The chronological classification is crucial: project operation, crediting, issuance, and retirement are four distinct processes.

PROJECT NAME IN THE REGISTER

PROJECT NAME IN THE REGISTER

West Huaybong 3 wind farm project

LOCATION

Huaybong and Nong Wang · Nakhon Ratchasima Province, Thailand

GOLD STANDARD ID

GS7746

PROJECT PARTICIPANT

First Korat Wind Company Limited

PROJECT DEVELOPERS IN THE REGISTER

Kosher Climate India Pvt. Ltd.

PROJECT APPROACH AND METHODOLOGY

Grid-connected onshore wind energy · ACM0002 “Grid-connected electricity generation from renewable sources”

INSTALLED CAPACITY

103.5 MW · 45 wind turbines with 2.3 MW each

PROJECT STANDARD AND PRODUCT

Gold Standard for the Global Goals · Gold Standard VER

PROJECT START · COMMISSIONING · CREDITING

15/08/2011 · 14/11/2012 · 01/12/2019–30/11/2024 (ended)

MITIGATION, MONITORING, VERs AND RETIREMENTS

139,035 t CO₂e per year (registry estimate) · 241,701 t CO₂e documented (01/11/2021–31/12/2023) · 191,319 VERs issued · 5,929 retired

TEST BENCH OF THIS PAGE

TEST BENCH OF THIS PAGE

5 September 2026

Regarding the period: The specified crediting period ended on 30 November 2024. The status "Gold Standard Certified Project" and subsequent retirements do not automatically prove new creditable reductions. For context: 241,701 t CO₂e relate to the period 01/11/2021–31/12/2023 and do not represent an annual value; issuance and retirement are different processes.

02 · WHAT THE PROJECT PROVIDES FOR

Harness wind energy, feed electricity into the grid and document the generation

For the carbon footprint, it is not only the nominal capacity of the plants that counts. The decisive factor is the amount of electricity generated within a specified period and fed into the Thai grid at the defined metering point.

01

Converting wind into electricity

45 turbines, each with 2.3 MW, result in 103.5 MW of installed capacity. This technical capacity does not yet represent generated electricity or an emissions reduction.

02

Feed electricity into the grid

The electricity generated is fed into the Thai grid. It does not follow that specific households, products or companies are directly supplied with this electricity.

03

Document creation

Main and backup metering, grid feed-in records and independent audits form the data chain for quantification. The documents specify metering equipment with an accuracy of at most ±0.2%.

03 · HOW A UNIT IS CREATED

Grid feed-in is converted into a calculated emission reduction.

Grid feed-in is converted into a calculated emission reduction.

ACM0002 forms the methodological framework mentioned in the documents for grid-connected electricity generation from renewable sources.

01

Set baseline

The reference scenario describes how the corresponding amount of electricity would have been provided in the Thai electricity system without the project.

02

Measure electricity quantity

The electricity actually generated and fed in at the defined metering points is documented for the monitoring period.

03

Apply emission factor

The eligible amount of electricity is linked to the methodologically determined emission factor of the electricity system. Relevant project and leakage emissions are taken into account.

04

Verify and issue

Following independent audit, VERs with vintage and serial numbers can be issued in the registry. A subsequent retirement documents their specific use.

04 · OTHER PROJECT REFERENCES

What can be described in addition to the VER calculation

The register identifies four certified SDG references. This designation is not a generalised promise of impact: specific statements require an indicator, source, and period in each case.

ENERGY SYSTEM

103.5 MW wind energy in the power grid

The plants expand the grid-connected generation capacity from wind energy. Which conventional generation is offset in the reference case is considered methodologically via the baseline.

MONITORING

Generation via defined measuring points

The documents describe main and redundant measurements as well as the evaluation of grid feed-in. This data forms the basis of the calculation.

INFRASTRUCTURE

Long-term technical operation

The project documents state a technical design life of 20 years for the plants and a project duration of 23 years. These are planning specifications, not a guarantee of actual operation or impact.

ENVIRONMENT AND SURROUNDINGS

Consider impacts separately

During operation, wind energy does not require any fossil fuel. Impacts on land use, landscape, noise, biodiversity and local communities must be examined separately.

FOR COMMUNICATION

The register entry mentions good health and well-being, affordable and clean energy, decent work and economic growth, and climate action. For any further communication, it remains crucial which specific indicators were recorded and verified in the respective monitoring.

05 · FOR SUPPORTING COMPANIES

Issued VERs are not yet an allocation to a company.

The register shows 191,319 issued and 5,929 retired VERs. Concrete support only becomes traceable through the unique retirement for a beneficiary.

The register shows 191,319 issued and 5,929 retired VERs. Concrete support only becomes traceable through the unique retirement for a beneficiary.

A reliable allocation includes at least:

01

Project name and Gold Standard ID GS7746

02

specific quantity in t CO₂e

03

Vintage or monitoring period

04

Decommissioning date and register reference

05

full serial number range

06

Beneficiary and documented purpose of use

The profile explains the project. A company's actual climate contribution is only proven by the retirement and allocation certificate.

The profile explains the project. A company's actual climate contribution is only proven by the retirement and allocation certificate.

06 · CLASSIFICATION AND COMMUNICATION

What the support means – and what it doesn't

A voluntary climate contribution is presented separately from reductions within one's own value chain.

IT DOCUMENTS

IT DOES NOT AUTOMATICALLY MEAN

a project in the registry status 'Gold Standard Certified Project'

ongoing crediting beyond 30 November 2024

an emission reduction calculated in accordance with ACM0002 for defined periods

a direct measurement of avoided CO₂ emissions at the wind turbine

103.5 MW of installed capacity

a certain amount of electricity, utilisation or emission reduction without a specific time period

a registry entry with issued VERs

automatically an Article 6 authorisation, a CCP label or an external rating

Electricity generation without fossil combustion in plant operation

Environmental neutrality or a comprehensive assessment of land and biodiversity impacts

the retirement of specific CERs for a beneficiary

a reduction of own emissions, climate neutrality, or a green product label

It is not the number of wind turbines that proves the climate protection unit, but rather the verified period, the issued VER, and its clear allocation.

It is not the number of wind turbines that proves the climate protection unit, but rather the verified period, the issued VER, and its clear allocation.

07 · SOURCES AND RELEVANCE

The basis openly accessible

Status and units may change. The current register entry and the project, monitoring, and verification documents published there remain authoritative.