The project operates wind turbines with a total capacity of 44.40 MW in Madhya Pradesh and Rajasthan. This page documents project activity, methodology, standard and registry entry – and contextualises what supporting it does and does not mean.

Wind turbines in a dry landscape near Jaisalmer in Rajasthan

JAISALMER · REPRESENTATIONAL IMAGE

Note: The image is for regional and technological context and does not show the described project. Photo: Pranshi / Pexels.

COUNTRY

India

Verra ID

VCS 835

PROJECT TYPE

Wind energy · Grid-connected

STATUS IN REGISTER

Registered

WHY TRANSPARENCY MATTERS

Anyone who supports an avoided emission should know what it was compared to.

Anyone who supports an avoided emission should know what it was compared to.

A CO₂ certificate is initially a registered unit. The associated climate contribution only becomes traceable once the project, methodology, grid reference value, monitoring period, and allocation are recognisable.

A CO₂ certificate is initially a registered unit. The associated climate contribution only becomes traceable once the project, methodology, grid reference value, monitoring period, and allocation are recognisable.

The project generates wind power and feeds it predominantly into regional electricity grids; a small portion is fed into the grid for self-consumption on an accounting basis. The emission reduction does not occur as a directly measured quantity of CO₂ at the turbine. It is calculated from the measured amount of electricity and a methodologically determined emission factor of the reference grid.

A registry entry does not replace a declaration of performance. But it makes its basis verifiable.

01 · PROJECT AT A GLANCE

The data pass for the project

The information refers to the publicly accessible Verra registry entry and the project information stored there. Dynamic registry details are subject to change.

PROJECT NAME

44.40 MW Wind Energy Project by Ruchi Soya Industries Limited, India

COUNTRY AND REGIONS

India · Madhya Pradesh and Rajasthan

LOCATIONS ACCORDING TO PROJECT DOCUMENTS

including Ratlam, Jodhpur, and Jaisalmer

VERRA PROJECT ID

VCS 835

PROJECT SPONSORS IN THE REGISTER

Ruchi Soya Industries Limited

PROJECT TYPE

Grid-connected onshore wind energy

INSTALLED CAPACITY

44.40 MW

SYSTEMS

56 wind turbines: 44 × 600 kW and 12 × 1,500 kW

MANUFACTURERS AND MODELS

Suzlon Energy Limited · S52 and S82

METHODOLOGY IN THE REGISTER

ACM0002; version details are not shown in the overview

METHODOLOGY IN DOCUMENTS FOR THE SUBSEQUENT PERIOD

ACM0002, Version 20.0

PROJECT START

26/02/2010

CREDITING PERIOD IN THE REGISTRY OVERVIEW

26/02/2010–25/02/2020 · Term 1

FOLLOW-UP PERIOD IN LATER PROJECT DOCUMENTS

26/02/2020–25/02/2030

ESTIMATED AVERAGE ANNUAL REDUCTION

81,853 t CO₂e according to current registry overview

VALIDATION OFFICE IN THE REGISTER

TÜV NORD CERT GmbH

TEST BENCH OF THIS PAGE

04/09/2026

Regarding the data situation: The Verra overview continues to show the first crediting period. Joint project and monitoring documentation stored there describes a subsequent period up to 2030, as well as a differing annual estimate. For this reason, the information here is separated by source and not mixed into a single "current" value.

02 · WHAT HAPPENS IN THE PROJECT

Wind becomes metered electricity

The project activity comprises wind energy converters at several locations. The electricity generated is metered and either fed into the regional grid or transmitted via grid utilisation for self-consumption.

01

Generation

56 onshore wind turbines with a total of 44.40 MW generate electricity without fuel combustion on site.

02

Grid utilisation

After registration, the electricity from most systems is sold to state utilities. Three 600 kW systems supply electricity via the grid for the company's own consumption.

03

Monitoring

For accounting purposes, the net electricity volume actually measured is decisive – not just the installed capacity or a forecasted annual production.

03 · HOW A UNIT IS CREATED

Emission reductions are not read from the turbine.

Emission reductions are not read from the turbine.

It is calculated within a specified model from measured power generation, the reference grid and the project emissions taken into account methodologically.

01

Determine reference network

The methodology determines which electricity system is considered and how its emission factor is calculated from operational and capacity expansion data.

02

Measure electricity quantity

Meter data records the net electricity generation or net grid feed-in eligible for the project during the monitoring period.

03

Calculate reduction

The measured amount of electricity is linked to the methodologically determined grid emission factor; relevant project emissions and requirements are taken into account.

04

Check and register

Monitoring report and calculation are independently verified. Only after this can VCUs be issued for a specified period.

04 · OTHER DESCRIBED POSTS

Consider climate impact and potential additional benefits separately

Wind energy can have further effects beyond the balanced reduction of greenhouse gases. However, these are not automatically quantified in the same way or individually proven for each unit issued.

POWER SYSTEM

Additional renewable generation

The project feeds wind power into a regional electricity system. Which conventional generation is displaced on balance is determined by the methodology – not by a direct allocation to an individual power plant.

OPERATION

No on-site incineration

Electricity generation does not require an ongoing use of fuel. This does not mean that manufacturing, infrastructure, land use and decommissioning are free of impacts.

TECHNOLOGY

Operation and Maintenance

The project documentation names Suzlon and associated companies as suppliers and operation and maintenance partners. A specific employment effect per certificate is therefore not proven.

REGION

Contribution to the energy infrastructure

The plants expand renewable generation capacity. A general improvement in local security of supply cannot be deduced from this alone.

SDG REFERENCES

For a wind energy project, references to SDG 7 'Affordable and Clean Energy' and SDG 13 'Climate Action' are particularly obvious. natureOffice does not use this classification as a seal of approval or as proof of a comprehensive sustainability status.

05 · FOR SUPPORTING COMPANIES

Not just a crowd. A documented connection to the project.

This project profile describes the project. A separate allocation or retirement report indicates whether and to what extent units have been allocated to a specific climate contribution.

Name and Verra ID of the project

allocated quantity in t CO₂e

Vintage or monitoring period

Write-off date and register reference

Serial numbers or unique VCU references

Beneficiary or documented purpose

The value does not lie in a green predicate. It lies in clearly assigned and verifiably documented support.

06 · CLASSIFICATION AND COMMUNICATION

What the support means – and what it doesn't

A voluntary climate contribution is presented separately from emissions within one's own value chain.

IT DOCUMENTS

IT DOES NOT AUTOMATICALLY MEAN

a contribution outside one's own value chain

a reduction in one's own emissions

the allocation of specific registered entities

Climate neutrality of a product or company

an emission reduction calculated in accordance with ACM0002

the physical decommissioning of a specific coal-fired power plant

Wind power without on-site fuel combustion

electricity generation with zero impact over its entire life cycle

Project, Standard, Vintage and Quantity

a comprehensive sustainability assessment or a project rating

a documented write-off or decommissioning

the admissibility of each advertising claim

A climate contribution should not sound bigger than can be documented.

07 · SOURCES AND RELEVANCE

The basis openly accessible

Project status, issued units and deposited documents may change. The current register entry remains authoritative.